Project Value: $1.5m

Project Duration: 17 weeks

Client: Queensland Rail

Project Overview

This project involves the design and construction of a single span fibre composite pedstrian bridge between the two platforms at Banyo Station.

Project Characteristics

This contract includes;

  • Design and Design documentation;
  • Minor Excavation;
  • Retain Wall construction;
  • Concrete pad footings and blade piers;
  • Manufacture and Assembly of a fibre composite span and 2 set of stairs cases; 
  • Erection of pedestrian bridge;
  • Commissioning of pedestrian bridge.

Key Project Outcomes

This project is being constructed to significantly improve station and commuter safety while moving in and around the station.