Project Value: $5.1m
Project Duration: 30 weeks
Client: Department of Transport and Main Roads
Project Overview
This portion of the V1 Veloway Bikeway Project is for a bridge over Juliette Street and a section of bikeway from Cornwall Street to O'Keefe Street.
Project Characteristics
This contract includes;
- Earthworks;
- Drainage;
- Cast in-situ bored piles to the bridge substructure;
- Concrete substructure construction;
- Manufacturing and Erection of structural steel truss bridge;
- Construction of a concrete cast in-situ deck;
- Manufacture and placement of bridge balustrade and complete bridge caging;
- Guardrail and fencing;
- 1,300m2 of new concrete bikeway;
- Construction of block masonary, concrete and stone pitched retaining walls;
- Soil nailing and concrete shotcreting;
- Concrete traffic barrier works.
Key Project Outcomes
The V1, once completed, will run from Brisbane City to the Gateway Motorway off-ramp at Eight Mile Plains. The 17km connection will successfully provide the missing links within existing cycleway network and ensure a safe and dedicated commute for cyclists. The Veloway will also help promote an active and healthy lifestyle.