Project Value: $1.5m
Project Duration: 17 weeks
Client: Queensland Rail
Project Overview
This project involves the design and construction of a single span fibre composite pedstrian bridge between the two platforms at Banyo Station.
Project Characteristics
This contract includes;
- Design and Design documentation;
- Minor Excavation;
- Retain Wall construction;
- Concrete pad footings and blade piers;
- Manufacture and Assembly of a fibre composite span and 2 set of stairs cases;
- Erection of pedestrian bridge;
- Commissioning of pedestrian bridge.
Key Project Outcomes
This project is being constructed to significantly improve station and commuter safety while moving in and around the station.